What is the lead time for production of skiwear 请阐述什麽是滑雪服生产的订货到交货前置时间。
What are the factors that contribute to lead times being so long 是什麽原因导致前置时间那麽长?
L t lead time 前置时间生产前准备时间
What are the operational and competitive results of these long lead times 这麽长的前置时间造成营运和竞争上的结果有哪些?
10 week lead times on all quotes , but some materials have 12 week lead time from the us . we need to have notice for all materials requiring more than 2 weeks lead time since our quotes to customers do not give us more than 10 weeks to deliver finished goods 所有的报价有10个星期的前置时间,但是有些从美国过来的原材料有12个星期的前置期,我们需要要求所有的原材料有超过2周的前置期,原因在于客户并没有给出我们超过10周的时间来交付成品。
前置: prepose; preposition; pre-时间: time; hour订购前置时间: purchase-ordering lead time前置时间冲销: lead time offset请购前置时间: procurement load time生产前置时间: production lead time订单处置前置时间: order handling lead time新产品前置时间: new-product lead time前置时间(生产前准备时间): l/t lead time放置时间: standing time; storage period搁置时间: lay-time静置时间: standing time晾置时间: open assembly time设置时间: set time; set up time闲置时间: ideal mixing time; idle mixing; idle time; free time; slack time; standby time; standby unattached time闲置时间;闲时: time,idle预置时间: preset time整置时间: setup time静电静置时间: time of repose time of rest设置时间间隔: setinterval闲置时间差异: idle time variance闲置时间开支: idle time expense低收敛重设置时间: low convergence reset time底涂料的晾置时间: open time of the primer干酪(加工时的)静置时间: healing time